It always seems like things are going faster once you start framing. Sorry again about the wind noise. Seems like there are very few days when we aren't getting blown away. Showing that the rafter supports are going up as well as door frames. Showing the lag bolts that I used to attach the floor supports. I used 3/8 by 4" lag bolts with a flat washer. I drilled the 7/8" pocket (so the bolt won't stick out too much) then a 1/4" pilot hole as deep as the bolt is long, then a 3/8" hole through the first board (the one with the pocket). I tightened them with a speed wrench and a ratchet.
 

 