Same as before I'm waiting for a mic I can use in the wind, so the sound sucks. Sorry,


This is the first part of the materials for the pig facility/shed/building I'm building. I should have enough for the basic framing. When I picked it up they gave me 14 foot 2x6's instead of 12 foot. I decided to make the side with a floor larger to not waste the extra 2 feet. That will make a few issues with other boards being too short, so I will have to adjust things on the fly. I had to get to the panel on the bottom of the pile so I took some of the stuff I need sooner like the posts off the trailer and put it on the truck.

 

Master File: 2012OhlhWeb